Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank

Product Details
Customization: Available
After-sales Service: Engineers Overseas for Technology Support
Warranty: 3 Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
20000000 RMB
Plant Area
>2000 square meters
  • Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
  • Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
  • Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
  • Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
  • Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
  • Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Find Similar Products

Basic Info.

Model NO.
BARUI-PST
Condition
New
Customized
Customized
Certification
ISO9001, QS, GS, TUV, GB
Tank Marerial
Metal Tank
Type
Oil Depot
Storage Objects
Liquid
Tank Materials
Carbon Steel or Stainless Steel
Tank Installation Type
Weld Type
Tank Roof
Cone Roof
Internal Floating Roof
Optional
Common Storage Medium
Gasoline, Gas Oil, Fuel Oil, Bitumen
Operation Pressure
Common Pressure
on-Site Installation Service
Optional
Tank Farm Design
Optional
Tank Foundation Design
Optional
Tank Anti-Corrosion
Optional
Tank Heat-Insulation
Optional
Fire Fighting Engineering
Self-Build by The Owner
Quality Inspection
Magnetic Particle Test, Kerosene Penetration Test
Overseas Service
Included
Turnkey Contract
Optional
Transport Package
Standard Container Package
Specification
100 to 100, 000 CBM
Trademark
BARUIE
Origin
Henan China
HS Code
7326901900
Production Capacity
14000 Ton Per Year

Packaging & Delivery

Package Size
5800.00cm * 2200.00cm * 2150.00cm
Package Gross Weight
12000.000kg

Product Description

Anti-corrsion materials internal floating roof chemical storage tank

Henan Barui company is a comprehensive group company in petroleum industry engineering, biomass engineering and environmental protection engineering. We supply complete services of oil depot construction all over the world. We ever built many oil depots for oil stations or petroleum refineries, the capacity of oil depot is from 10,000 cube meters to 500,000 cube meters. Our company also accepts subcontracted projects, like oil depot design, tank materials and accessories supply, tank installation and construction, anti-corrosion engineering construction, heat insulation engineering construction, pipeline engineering construction and so on.

Common models of oil tanks for oil depot are as following sheet:

 
Item Unit Specification of common tanks
Nominal Volume m3 100 500 1000 2000 3000 5000 10000 ......
Actual Volume m3 110 554 1100 2176 3443 5595 10907 ......
Internal Diameter mm 5200 9000 11500 15800 18900 23700 31200 ......

Technical Stadnard:
  1. The manufacture, acceptance test and acceptance of this tank depends on GBJ128-90, "Code for construction and acceptance of stand cylindrical steel welded oil storage tank".
  2. This tank can be installed after confirming that foundation inspection is qualified.
  3. The technical parameter of steel plates meets the regulations of GB3274, "Carbon Structure and Low Alloy Structure Hot Rolled Thick Steel Plate and Strips ".
  4. Opening Holes shall keep away from the welding lines on the tank wall, the distance between the edge of joint pipes or reinforcing ring and welding lines of tank wall steel plates shall be more than 100 mm.
  5. After installation of the tank, the external surface shall be painted with twice primer paint and twice finish paint.
  6. The position of opening holes, ladders and platform is according to this drawing.
 
Step 1: Foundation construction of Oil Tanks

With the geologic examination data, make the drawings and construction scheme.

Anti-Corrsion Materials Internal Floating Roof Chemical Storage TankAnti-Corrsion Materials Internal Floating Roof Chemical Storage Tank

 
Step 2: Pre-fabrication of oil tank materials

Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Step 3: Installation of oil tanks

Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank

 
Inspection and acceptance of oil tanks

Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
 
Delivery site


Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank
Anti-Corrsion Materials Internal Floating Roof Chemical Storage Tank

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now