Customization: | Available |
---|---|
After-sales Service: | Engineers Available to Service Machinery Overseas |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Step 1. Pre-heating for flash evaporation.
Step 2. Separate water and light fractions (gasoline)
Step 3. Heat raw material oil in furnace for reaching desired temperatures.
Step 4. Separate diesel, base oil and asphalt.
Step 5. After filter, getting final good product.
1 --- Having advantages of novel technical method, reasonable and economic technical route as well as significant ecological efficiency, the technical method of this project not only greatly saves production costs, but also reduces equipment investment and broadens the operating flexibility, which also creates great convenience for production operations.
2 --- During the whole process, materials and products continuously exchange heat for several times, realizing the recycling of heat energy and saving a lot of energy.
3 --- Non-condensable gas enters into the reactor and burns as fuel, saving energy and reducing environmental pollution, which creates more environmentally friendly production process.
4 --- Adjusting the reflux ratio ensures the color of the product.